Jump to content

Minor but confusing UI issue in BPM editor; crossed workflow arrows


Recommended Posts

Posted

Hi guys, please can you put this one on the roadmap for minor fixes?

image.png.1718367cf2e1c5d2918d6cf4e0394852.png

When you have nodes like that, the entrance and exit are the wrong way around, in this case on the "to Repair" node. Looks like a minor tweak is needed to cater for that situation.

Posted

Via doesn't really help (and would be very tedious to put two in every time we get this).

There's a UI issue here where staggered nodes seem to insist on having the in- and out-bound connections the 'wrong' way around.

image.png.403dd778882c58b0ce5dbe74c135976f.png

Posted
42 minutes ago, Berto2002 said:

having the in- and out-bound connections the 'wrong' way around.

I've tested this to confirm what I thought was the case, and in- is always the upper connector.

Posted

OK; I see it's working by design.

I guess would need to be a (very minor) enhancement; there are many, many cases when flows go up as well as down.

I venture that a future design improvement could accommodate a variable connector location dependent upon whether the previous and subsequent nodes are below or above.

Cheers Steve

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...