  1. Hello everyone who tagged along on this thread, We've found a setting, below, that means if a stage isn't used within the BPM, it does not show in the stage timeline visualisation. app.bpm.display.skippedstages.hideHide stages in the BPM HUD once they have been skipped It's working for us so far . Regards
  2. Dragging a node arrow to link it to another, has started moving the whole node (while the arrow flails about stuck to the side). It still links but you then have to move the node back into place. I have been making PCFs and BPMs pretty consistently for a few weeks and have noticed it starting on 23/5/18
  3. Background info: I am converting many branching BPMs from an older system and the stage structure does not lend itself for different process paths. I know you can jump to further stages but this leaves the analyst with breaks in the stage-visualisation (picture attached) and condenses information by including everything. In this case the greyed out section is everything for a different type of order, currently defined in the first stage. Can you exclude stages in the visualisation or can you link out to different, more specialised, BPMs based on the answer in a single progressive capture? Many thanks in advance
  4. How can I automate two outcomes in a Business Process based on the answer to a question in a Progressive Capture? I thought it may be 1. Making the capture complete a custom field with the variable answer 2. Have the BPM make a decision about what was based in that field. This did not work, so if this is a solution I've implemented it incorrectly. Thanks in advance.
×
×