HGrigsby Posted January 8, 2021 Posted January 8, 2021 Hi I have a BPM that has as a task that asks for a manager and leaver to be selected from a list and then adds them as a connection. It works fine for the manager one but not for the leaver and I can't see why they are the same. I have tried swapping the order, adding another one, making them both impacted and both on behalf of, but I only get one connection showing correctly. It does say there are two connections but only shows one. Anyone got any ideas Thanks Helen ?
Steve Giller Posted January 8, 2021 Posted January 8, 2021 Are you using the Co-Worker or Co-Worker (From Variable) option. If the latter, ensure that the Co-Worker option is set to Ignore, not Auto/Manual/Variable.
HGrigsby Posted January 8, 2021 Author Posted January 8, 2021 Hi @Steve Giller Thanks I am using the co-worker (from variable) option, the one for the leaver was set to Manual. I have changed it to ignore but still get the same result in the connections section. It is picking up the leaver selected in the drop-down though as I have it set to appear in the summary and it does. Thanks Helen
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now