HGrigsby Posted January 8, 2021 Share Posted January 8, 2021 Hi I have a BPM that has as a task that asks for a manager and leaver to be selected from a list and then adds them as a connection. It works fine for the manager one but not for the leaver and I can't see why they are the same. I have tried swapping the order, adding another one, making them both impacted and both on behalf of, but I only get one connection showing correctly. It does say there are two connections but only shows one. Anyone got any ideas Thanks Helen ? Link to comment Share on other sites More sharing options...
Steve Giller Posted January 8, 2021 Share Posted January 8, 2021 Are you using the Co-Worker or Co-Worker (From Variable) option. If the latter, ensure that the Co-Worker option is set to Ignore, not Auto/Manual/Variable. Link to comment Share on other sites More sharing options...
HGrigsby Posted January 8, 2021 Author Share Posted January 8, 2021 Hi @Steve Giller Thanks I am using the co-worker (from variable) option, the one for the leaver was set to Manual. I have changed it to ignore but still get the same result in the connections section. It is picking up the leaver selected in the drop-down though as I have it set to appear in the summary and it does. Thanks Helen Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now