Jump to content

All connections added in task don't show up


HGrigsby

Recommended Posts

Hi 

I have a BPM that has as a task that asks for a manager and leaver to be selected from a list and then adds them as a connection.

It works fine for the manager one but not for the leaver and I can't see why they are the same. I have tried swapping the order, adding another one, making them both impacted and both on behalf of,  but I only get one connection showing correctly.  It does say there are two connections but only shows one.

Anyone got any ideas

Thanks 

Helen 

?1676850567_taskcomplete.PNG.ba79694bd800d385e99045908d3fa945.PNG

114083677_afterconnections.png.de178d796744860800dc747c4e9ca0b5.png

 

Link to comment
Share on other sites

Hi @Steve Giller

Thanks I am using the co-worker (from variable) option, the one for the leaver was set to Manual.  I have changed it to ignore but still get the same result in the connections section. 

It is picking up the leaver selected in the drop-down though as  I have it set to appear in the summary and it does.

Thanks 

Helen

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...