Hi 

I have a BPM that has as a task that asks for a manager and leaver to be selected from a list and then adds them as a connection.

It works fine for the manager one but not for the leaver and I can't see why they are the same. I have tried swapping the order, adding another one, making them both impacted and both on behalf of,  but I only get one connection showing correctly.  It does say there are two connections but only shows one.

Anyone got any ideas

Thanks 

Helen 

?1676850567_taskcomplete.PNG.ba79694bd800d385e99045908d3fa945.PNG

114083677_afterconnections.png.de178d796744860800dc747c4e9ca0b5.png

 

Posted

Hi @Steve Giller

Thanks I am using the co-worker (from variable) option, the one for the leaver was set to Manual.  I have changed it to ignore but still get the same result in the connections section. 

It is picking up the leaver selected in the drop-down though as  I have it set to appear in the summary and it does.

Thanks 

Helen

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...