Add to change calendar - based on date & time question in ProCap


chrisnutt

Recommended Posts

Hi,

I'm trying to set the schedule of a change request automatically with the dates given through a progressive capture, which is populating the h_proposed_start_time and h_proposed_end_time with dates. I thought the "Add to change calendar" node might do it but have learned that that sets the schedule with a period of time (say 2 hours) from the time the node is reached rather than allowing it to be specified.

Is there a way I can inject the h_proposed_start_time/h_proposed_end_time into the schedule and therefore the change calendar?

Thanks

Chris